Skip to main content
    Contracts & Change Orders

    Cost-Plus / Time-and-Materials Schedule

    A cost-plus (T&M) schedule setting your labour rates, the markup on materials, and how costs are reported - structured to avoid the consumer-protection estimate trap on residential jobs.

    Medium risk

    Check your contract first. Consider a peer review before sending.

    Open this template

    Copy to clipboard, or download as Word or PDF.

    Format: Document (Word / PDF) · Downloaded 0 times

    When to use this

    • The scope cannot be fixed up front
    • You bill labour plus materials with a markup
    • You want to avoid the residential over-estimate trap