Cost-Plus / Time-and-Materials Schedule
A cost-plus (T&M) schedule setting your labour rates, the markup on materials, and how costs are reported - structured to avoid the consumer-protection estimate trap on residential jobs.
Medium risk
Check your contract first. Consider a peer review before sending.
Open this template
Copy to clipboard, or download as Word or PDF.
Format: Document (Word / PDF) · Downloaded 0 times
When to use this
- •The scope cannot be fixed up front
- •You bill labour plus materials with a markup
- •You want to avoid the residential over-estimate trap